Projects per year
Search results
-
Finished
Updating the Orapa Mine CUT 3 Closure Plan to Feasibility Study Level of detail in line with IDM 2022 and AA Mine Closure and Socio-Economic Assessment Tool (SEAT)
Fichani, K. (PI)
3/8/24 → 9/30/24
Project: Consultancy project
File -
R00136: Determining the efficiency of hydroponics against conventional farming systems in Botswana.
Ditshego, N. (PI), Rantong, G. (CoPI), Zungeru, A. M. (CoPI), Matsebe, O. (CoPI), Yahya, A. (PI), Ravi, S. (CoPI), Nyamukondiwa, C. (CoPI), Eliasson, P. (CoPI) & Gessesse, A. (CoPI)
7/1/20 → 6/30/22
Project: Research project
File -
R00062: Automated Livestock Identification And Trackback System Using Wsn For Zone 3b
Mangwala, M. (PI), Sigweni, B. (CoI), Zungeru, A. M. (CoI), Nyoni, B. (CoI), Kooletile, E. (Student), Motimedi, M. (CoI) & Ratladi, K. (CoI)
9/29/17 → 9/29/19
Project: Research project
-
BIUST/DS/R&I/8/2016: Erosion-Corrosion Mapping For Wc-Co And Wc-Co-Vc Alloys In Mine Water Environment
Ogunmuyiwa, E. N. (PI), Olubambi, P. A. (CoI), Stack, M. M. (CoI), Freemantle, C. (CoI), Shongwe, M. B. (CoI) & Johnson, O. T. (CoI)
2/1/17 → 8/31/18
Project: Research project